About ANK L.t.d.

Water

Infrastructure projects (water/wastewater transport systems and plants).

Roads

Construction projects (highways, viaducts, bridges, tunnels, etc).

Urban

Civil Construction projects (urban qualifications, offices, schools, etc.)

Professionalism

Collaborating for the general development of the Albanian infrastructure.

BuildingLegacy

ANK L.t.d. was established in 1998. As a general contractor with 25 years of knowledge and experience, ANK brings together the resources required by different projects financed by various national agencies and donors (KfW, WB, EU), and completes each one of them with the same meticulousness and responsibility.

Overview

For your companyBusiness

Objectively integrate emerging core competencies before process-centric communities.

ArchitectureProject Design

User generated content in real-time will have multiple touchpoints for offshoring testing procedures.

For the peopleResidential

Proactively leverage other resource-leveling convergence rather than inter-mandated networks.

BusinessConstruction

Dramatically visualize customer directed convergence without revolutionary covalent scenarios.

Product DesignProduction

Completely pursue scalable customer service through sustainable potentialities, diversity and empowerment.

Professional counselingConsultation

Completely iterate covalent strategic theme areas via accurate e-markets without functional solutions.

Turning your
vision into reality

Over the last decade, ANK L.t.d. has developed into a respected and dynamic presence in Albania.
Our main business areas are:

  • Construction and infrastructure projects (highways, viaducts, bridges tunnels, drinking water/ wastewater transport systems, and treatment plants);
  • Civil construction projects (urban qualifications, industrial buildings, schools, etc).
  • Manufacturing and Production of Construction Materials (concrete, asphalt and railway sleeper, starting from April 2024).

ANK L.t.d. aims to become one of the biggest companies in water, sewerage and road infrastructure projects, and a main collaborator for the development of the Albanian infrastructure.

At the core of ANK resides our Technical Structure, our Design and Construction Departments, our engineers, topographic surveyors and cad-experts, who possess experience & expertise in various types of construction works & carefully follow each project from conception to delivery.

Our staff undergoes trainings and courses on safety & health measures, in compliance with national and EU standards regarding quality, safety, and environment management.

Over the course of the past two decades, ANK has accomplished an extensive amount of work. This accomplishment positions the company to fulfill the financial and technical requirements necessary for participating in major project tenders, giving us the opportunity to be shortlisted and ultimately awarded important contracts.

https://ank.webart.al/wp-content/uploads/2023/05/2-1000x640.jpg

Let's build
together

Challenging projects
Proactively envisioned multimedia based expertise and cross-media growth strategies.
Awesome Clients
Credibly innovate granular internal or organic sources whereas high standards in web-readiness.
Award winning team
Energistically scale future-proof core competencies vis-a-vis impactful experiences.
Creative environment
Podcasting operational change management inside of workflows to establish a framework.

    Main Completed & Ongoing Projects

    2011 – 2022

    2022

    Road

    Construction of Korçë – Ersekë road, Lot 2 (first part).

    Duration: 2020 – 2022.

    Contracting Authority: Albanian Road Authority.

    2021

    Water Supply System

    Construction of water supply Erseka city  and a few of the villages, second phase, from Kozeli spring captures.

    Duration: 11/2020-10/2021.

    Contracting Authority: The Municipality of Kolonja.

    2021

    Water Supply System

    Construction/ Reconstruction of Water Supply Systems in Rural Areas in Albania – Lot 4.

    Duration: 04/2019-04/2021.

    Contracting Authority: Albanian Development Fund.

    2020

    Water Supply System

    Ersekë external water supply from Mavro and Gladishtë springs and internal network of Ersekë water supply.

    Duration: 02/2019 – 03/2020.

    Contracting Authority: National Water Supply and Sewerage Agency.

    2020

    School

    Construction of the new “Servete Maçi” school.

    Duration: 09/2017-01/2020.

    Contracting Authority: Municipality of Tirana.

    2018

    Water Supply System

    Rehabilitation of water supply system of Përmet city.

    Duration: 11/2017 – 04/2018.

    Contracting Authority: National Water Supply and Sewerage Agency.

    2018

    Road

    Completion of the remaining works and connection with the existing road of the object, paving and adjustment of the road Korçë – Ersekë, Segment 1.

    Duration: 10/2017-09/2018.

    Contracting Authority: Albanian Road Authority.

    2018

    Road

    Improvement of transport and interconnection infrastructure Qafshtamë (Municipality of Krujë)- Burrel (Municipality of Mat), with the purpose of promoting tourist attractions of the national park in Qafshtama. (Loti 2.1) ( road infrastructure with special interest of development).

    Duration: 08/2017 – 09/2018.

    Contracting Authority :Regional Development Agency.

    2018

    Road

    Paving and adjustment of the road Qafë Plloçë – Unaza Pogradec

    Duration: 05/2017 – 10/2018.

    Contracting Authority: Albanian Development Fund.

    2017

    Urban Qualification

    Urban qualification of streets in the block of “Selitë” palaces, restricted by Str. “Hamdi Pepa”, Str. “Ilia Dilo Sheperi”, Str. “Visarion Xhuvani” and Str. “Leka i Madh”, Administrative Area 5.

    Duration: 10/2016 – 10/2017.

    Contracting Authority: The Municipality of Tirana.

    2018

    Sewage System

    Construction of sewage system in the area of “Cold Water”, Vlora.

    Duration: 04/2016 – 06/2018.

    Contracting Authority: National Water Supply and Sewerage Agency.

    2017

    Road

    Construction of road “Dhimitër Konomi” (mbi Rrap), Vlorë.

    Duration: 05/2016 – 07/2017.

    Contracting Authority: Albanian Development Fund.

    2017

    School

    Complete reconstruction of the special school “Luigj Gurakuqi”.

    Duration: 06/2016 – 03/2017.

    Contracting Authority: Municipality of Tirana.

    2017

    Road

    Paving – Asphalting Road Korça – Ersekë, Lot 1.

    Duration: 06/2013 – 05/2017.

    Contracting Authority: Albanian Road Authority.

    2014

    Road

    Reconstruction of road Pezë e Vogël – Pezë e Madhe.

    Duration: 01/2013 – 04/2014.

    Contracting Authority: Albanian Development Fund.

    2015

    Road

    Reconstruction of road Krujë to Qafë Shtamë.

    Duration: 12/2012 – 05/2015.

    Contracting Authority: Albanian Development Fund.

    2013

    Water Supply System

    Construction of water supply system in villages of Midhe & Berishë, Bushat and Zagora, Shkodra region. 

    Duration: 07/2011 – 08/2013.

    Contracting Authority: Albanian Development Fund.

    [bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

    2021 – 2025

    2023

    Road

    Expansion of the road Elbasan – Qafë – Thane (Phase IV)

    Duration: 19/12/2023 – 19/08/2025.

    Contracting Authority: Albanian Road Authority.

    2021

    Water Supply System

    Construction of water supply system for the coastal areas of Shenkoll Administrative Unit, Lezhë Municipality.

    Duration: 02/2021 – 02/2025.

    Contracting Authority: Municipality of Lezhë.

    2022

    Road

    Construction of Korçë – Ersekë road, Lot 2 (second part).

    Duration: 06/2022-12/2023.

    Contracting Authority: Albanian Road Authority.

    [bold_timeline_item_button title=”Expand” style=”” shape=”” color=”” size=”inline” url=”#” el_class=”bold_timeline_group_button”]

    Certifications

    https://ank.webart.al/wp-content/uploads/2023/06/A.N.K.-1452-1-2022-BG_Page_2.jpg

    CertificateISO 1452-1:2009

    Plastics piping systems for water supply and for buried and above-ground drainage and sewerage under pressure – Un-plasticized poly(vinyl chloride) (PVC-U) — Part 1: General

    Information Security Management System

    https://ank.webart.al/wp-content/uploads/2023/06/A.N.K.-39001-2022-BG_Page_2.jpg

    CertificateISO 39001:2012

    Road Traffic Safety Management Systems

    https://ank.webart.al/wp-content/uploads/2023/06/A.N.K.-45001_2018-e-rinovuar_Page_2.jpg

    CertificateISO 45001:2018

    Occupational Health and Safety Management System

    https://ank.webart.al/wp-content/uploads/2023/06/A.N.K.-50001-2022-BG_Page_2.jpg

    CertificateISO 50001:2018

    Energy Management System

    https://ank.webart.al/wp-content/uploads/2023/06/A.N.K.-ISO-14001_2015-e-rinovuar_Page_2.jpg

    CertificateISO 14001:2015

    Environmental Management System

    https://ank.webart.al/wp-content/uploads/2023/06/A.N.K.-PAS-99-2022-BG_Page_2.jpg

    CertificatePAS 99:2012

    Integrated Management Systems

    Quality requirements for fusion welding of metallic materials – Part 2: Comprehensive quality requirements

    Trench lining systems – Part 1: Product specifications

    https://ank.webart.al/wp-content/uploads/2023/06/A.N.K.-Sh.p.k-28001-2022_Page_2.jpg

    CertificateISO 28001:2007

    Supply Chain Security management System

    https://ank.webart.al/wp-content/uploads/2023/06/A.N.K.-Sh.p.k-SA8000-2022_Page_2.jpg

    CertificateSA 8000:2014

    Social Accountability Management System

    https://ank.webart.al/wp-content/uploads/2023/06/ISO-9001_2015-e-rinovuar_Page_2.jpg

    CertificateISO 9001:2015

    Quality Management System